EMEA: Mobilisation of Bibby's ETAP project - in pictures

Aquatic was subcontracted by Bibby Offshore Ltd to replace subsea infrastructure in the Central North Sea as part of BP’s $1billion Eastern Trough Area Project (ETAP) Life Extension Project. Aquatic deployed its carousel system to install 35 kilometres of umbilical ensuring electrical control capability between ETAP’s central processing facility and the Machar field.

The case study documents the five-week long site preparation, equipment assembly, testing and mobilisation (and demobilisation) onto Bibby’s Olympic Ares.

 